Smedbyskolan, Norrköping, Schweden

  • Gebäudeart:
  • Bildung & Kultur
Vollbild Schließen

New school in Smedby, Norrköping

In May 2021, the construction of school in Smedby started after the previous school built 1960 was demolished. The new school is two storeys and accommodates grades F-6. An associated sports hall was also built as part of the project.

The new school has two classes per grade and is designed to meet modern educational needs.

Peikko has delivered the slim floor structure of DELTABEAM® and DELTABEAM® Frame, which offers several advantages for modern school environments. The frame was adapted to meet the school's need for large, open spaces with long spans and few columns. The solution provided flexibility and an optimal learning environment for both students and teachers.

Mehr lesen down-arrow.png

Projektdaten

Nutzfläche:
5000 m2
Geschosse:
2
Projektentwickler:
Norrevo
Bauunternehmen:
ED-Bygg
Tragwerksplanung:
ARQLY
Architektur:
Tyréns
Fertigteilwerk:
Budizol
Lieferzeitraum:
2022
Fertigstellung:
2024

Kontakt