Howest University Campus, Kortrijk, Belgien

  • Gebäudeart:
  • Bildung & Kultur
Vollbild Schließen

For the new university campus of Howest in Kortijk, Peikko's DELTABEAM® solution was chosen to be able to create slim floors and keep a lot of flexibility in the layout.

Peikko delivered more than 1,200 meters of DELTABEAM® composite beams for this project.  

For DELTABEAM® excellent preparation is needed and the engineering is very important. When the engineering is finalized, the base for a very fast building system is established. At the same time there are benefits for the installation of HVAC, since there is a lot more usuable height available when working with DELTABEAM®.

Tom Verplancke, site manager for Monument Vandekerckhove

Projektdaten

Geschosse:
5
Projektentwickler:
Howest, Hogeschool West-Vlaanderen
Bauunternehmen:
Monument Vandekerckhove
Tragwerksplanung:
ABDM
Architektur:
RAU
Lieferzeitraum:
2018
Fertigstellung:
2019

Lösungen von Peikko