Peikko is responsible for the foundation design with the structural calculations, and delivered all of the steel components to 26 wind turbine foundations. The deliveries included FATBAR® rock anchors, tower adapter plate with tower flange connection bolts, drilling templates- and assembling system, special reinforcement steel technology. Deliveries are scheduled to take place between April – August 2018.
The developer and future owner of Hitra 2 wind park is Fosen Vind DA, a joint venture between the Norwegian TrønderEnergi and Statkraft, and Nordic Wind Power DA, formed by an European investor consortium of Credit Suisse Energy Infrastructure Partners and Swiss BKW AG. The project will be executed by Statkraft. Hitra 2 wind park is a part of the Fosen Vind, wind power project. Fosen Vind is Europe's largest land-based wind power project, consisting of six wind farms with a combined capacity of 1,000 MW.
PEAB, one of the leading Nordic construction and civil engineering companies, is the general contractor of the civil earthworks and infrastructure, and will also carry out the the technocal assembly of steel components and casting works of the Peikko Rock Anchored Foundations. Vestas shall deliver 26 of their V117-3.6 MW turbines with a hub height of 87 meters. The wind park is estimated to be operational by the end of 2019